In the power industry, generator reliability isn’t just about keeping the lights on—it’s about avoiding catastrophic revenue losses and ensuring grid stability. Even a minor imbalance in a generator’s stator core can cascade into unplanned downtime, costing millions in lost revenue and repair costs.

The Crisis:
A critical 63MW generator unit at a Tata Power plant faced uneven stator core heating, with temperatures spiking 20°C above normal. Left unresolved, this anomaly risked:

  • 45-day full-unit shutdown, disrupting grid supply.
  • $8M+ in lost revenue from halted power generation.
  • Safety hazards from potential core insulation failure.

Learn how UptimeAI Expert enabled the plant operations team to identify the root cause of this anomaly 45 days early, avoiding losses from generator failure
 